SUbscriber Login | NEW SUBSCRIPTION  

PSC's Foster Campbell: 'I won't apologize for doing my job'

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
in

I regret that Claiborne Electric Cooperative has prematurely ended its participation in the Public Service Commission’s feasibility study of Claiborne’s proposed internet project. With Claiborne’s support for the study and its cost, the PSC retained a qualified consulting firm to determine if the 26,000 members of the co-op should risk their electric rates to finance an $82-million internet business. That study was under way.

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share