SUbscriber Login | NEW SUBSCRIPTION  

Sewer rehab project nears

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.

“The Pipeline Analysis group will have crews that will work with our crews. They will be supplementing what we do already,” said Richard Aillet, water utilities director. “Normally our crews do inspections and find problems, but we don’t have the time to come in and do all the repairs. This gives the city additional manpower to identify sewer main problems and fix them.”

Smoke and dye tests will be conducted, and a camera will be run inside a sewage line to look for problems in the areas of the city where the sewer system is 50 to 70 years old.

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share