SUbscriber Login | NEW SUBSCRIPTION  

GSU prepares for demolitions

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.

“This is the largest demolition we’ve ever had,” Sanders said. “In the first phase, we did Jones (Hall) and Martha Adams (Hall), but that was all we did. The program is as we bring on new housing, we’ll vacate these and knock them down.”

On the schedule in the long term are Tubman Hall, Bowen Hall, Truth Hall and Bethune Hall. They are set for demolition some time in 2009, Sanders said.

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share