SUbscriber Login | NEW SUBSCRIPTION  

Library project worth a few delays

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.

Originally, estimates called for the Events Center to be open before the end of 2009 and for groundbreaking before the end of 2008. With approval held up over a letter to the state on behalf of the library board by a community member, as well as a series of small tweaks to the center’s design that needed board-level approvals from both bodies overseeing the work, those dates have been pushed back. Groundbreaking is more likely in the spring of 2009, with a finish date somewhere near the beginning of 2010.

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share