SUbscriber Login | NEW SUBSCRIPTION  

Plan ahead for your commute

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.

Work on both the U.S. 167 bridges and the Interstate 20 ramps at La. 33 will continue, at least for the time being, and that means congestion, longer commute times and possibly irritable motorists. La. 33 is also undergoing work on the extreme north side of the city, which puts long-range commuters to and from the Union Parish area in a bit of a sticky spot.

There’s work that will continue to cut off Everett Street into the university, as well and more north of the interstate at Chautauqua that is taming the flow of traffic there.

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share