SUbscriber Login | NEW SUBSCRIPTION  

Library expansion takes off

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.

The event center will be built into 22,000 square feet of surplus space attached to the 39,000 square feet of existing library, McCain said.

It is proposed to house a 300-seat auditorium with moveable walls to accommodate three breakout rooms, a foyer, a connecting corridor to the existing library that will accommodate small exhibits, storage, a genealogy and local history center and three additional study rooms, as well as an exhibit area.

Costs of the project are unknown at this point, McCain said, and will be until plans are finalized, which could take well into 2008.

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share