SUbscriber Login | NEW SUBSCRIPTION  

RHS construction moving along

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
in
Two new buildings expected for completion in February
110812 New Tech building C.jpg
Leader photo by SCOTT BOATRIGHT Pictured is the New Tech @ Ruston building currently being constructed on Ruston High’s campus. In the background, the new agriculture building, which now has some walls erected, is visible.

Things are moving along, even a little ahead of schedule, with the two construction projects at Ruston High School.

The old agriculture building was torn down, and a new one is being built on the campus. This new building will be much roomier and add three classrooms.

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share