SUbscriber Login | NEW SUBSCRIPTION  

D’Arbonne lake drawdown on schedule

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
in

The D’Arbonne Lake Watershed Commission held its monthly meeting last week, with reports being given on the lake alternative spillway addition and the 2012 lake drawdown project.

Commission President Noel James said that while recent weather has slowed the alternative spillway project, that delay is not expected to affect the timeline for completing the project.

“We’ve had a lot of rain that’s slowed things down,” James said. “But there was good progress made before the weather started and it looks like things are still on track to get things completed on time.”

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share