SUbscriber Login | NEW SUBSCRIPTION  

A modernized GSU in the works

  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.
  • warning: Parameter 2 to ad_flash_adapi() expected to be a reference, value given in /var/www/vhosts/rustonleader.com/httpdocs/includes/module.inc on line 497.

“Ambling did an outstanding job of taking the President’s vision and meeting it,” he said.

Approximately 12 to 15 companies submitted bids for the project, with four chosen for the final selection. The university is in the process of finalizing negotiations with Ambling; preliminary survey and engineering work has begun.

The multi-phase construction will begin with the demolition of two old dorms. Martha Adams and Jones Hall are currently unoccupied; they were closed due to various problems associated with aged structures.

Full text of this article is available to subscribers only. Login if you are already a subscriber. If you are not a subscriber, you can subscribe to the online version here.

Bookmark and Share